Header Graphic
 

Calibrating Insulation Resistance Testers

According to the QLD Electrical Safety Act 2002 -  Section 18 - (2)(b) : if a testing instrument can not be visually confirmed as being correctly functioning and safe — that the instrument is tested at least every 6 months to ensure it is in proper working order.

 

Using our advanced high accuracy calibrator with measurement capabilities up to 1TOhm, we can test the full range of analog and digital Continuity and Installation Resistance Testers to insure they are operating within specification.

 

Ensure your equipment is in specification so the continuity and installation resistance you do is conducted in accordance with AS/NZS 3760 "In-service safety inspection and testing of electrical equipment".

 

 

 

All measurements are traceable to national and international standards via a registered NATA laboratory or a mutually recognised international testing authority. (See NATA’s International Activities