Calibrating Insulation Resistance Testers
According to the QLD Electrical Safety Act
2002 - Section 18 - (2)(b) : if a testing instrument can not be visually confirmed as being
correctly functioning and safe — that the instrument is tested at least every 6 months to
ensure it is in proper working order.
Using our advanced high
accuracy calibrator with measurement capabilities up to 1TOhm, we can test the full range of analog and digital
Continuity and Installation Resistance Testers to insure they are operating within
specification.
Ensure your equipment is in specification so the continuity and installation resistance you do
is conducted in accordance with AS/NZS 3760 "In-service safety inspection and testing of electrical
equipment".
All measurements are traceable to national and international
standards via a registered NATA laboratory or a mutually recognised international testing authority. (See
NATA’s International Activities )
|